450 parking spaces

 

To comply with the permitted building height one level of the parking deck was placed in-ground. The entire perimeter was opened up by sloped embankments so that natural ventilation could be guaranteed and more light would enter the building. The modestly designed functional building houses the vehicles of students and staff of the university of applied sciences. A future raising of the structure by 6 split levels is statically admissible.

bleiben Sie in Kontakt

Sie suchen aktuelle Informationen, möchten eine Anfrage stellen, wollen auf dem Laufenden bleiben oder Ihre Karriere bei HUBER starten?

Hier sind Sie richtig:

Aktuelles

Karriere

Kontakt